Confirm drawings, bill of materials, finish, accessories, labels and packing requirements.

From approved drawing to export preparation
Aluminum Pergola Factory Process
LUCY coordinates approved drawings, aluminum profile preparation, machining, finishing, component checks, hardware kitting and protected export packing for custom pergola orders. Each production stage follows the released project information so components, accessories and package references remain connected to the installation drawings.
Aluminum pergola profiles and roof components checked during factory assembly.
Factory due diligence
Evaluate the manufacturing process, not only the finished image.
A B2B pergola supplier should be assessed through drawing control, material and finish checks, machining, assembly verification, packing and shipment preparation. Ask which records and samples apply to your order.
Review the applicable incoming, machining, finish, assembly and function checks.
Confirm quantities, component identification, protection, documents and loading plan.
State market-specific documents, inspection needs and acceptance criteria in the order brief.
Manufacturing workflow
The factory workflow begins with released project information and ends with identifiable, protected packages. Drawings, component schedules and finish references remain the common production record across preparation, machining, checks and packing.
| Stage | Primary output |
|---|---|
| Drawing release | Approved module and interface information |
| Profile preparation | Identified cut components |
| Machining and finish | Prepared architectural profiles |
| Interface checks | Coordinated roof, drainage and accessory parts |
| Packing | Protected packages linked to the order |
Drawing release
Before preparation starts, the project team confirms module dimensions, post locations, roof movement, drainage outlets, finish, accessories and control zones. The released revision is used for purchasing, machining, inspection and package identification.
- Dimensioned module layout
- Roof and post orientation
- Outlet and accessory locations
- Finish and component schedule
Profile preparation
Aluminum profiles are selected from the approved schedule, identified and prepared for the required module. Cut planning considers component length, visible finish and the relationship between frame, roof and post parts.
Machining and finish
Cutting, drilling and slot preparation follow the released component information. Drainage paths and connection positions require consistent machining across connected modules. Finish is coordinated against the approved color or sample, with protected handling after coating.
Component, motor and hardware preparation
Frame connections, roof movement, drainage routes, selected motors, controls, seals and hardware groups are coordinated as one component package.
| Interface | Factory coordination focus |
|---|---|
| Frame and roof | Connection alignment and moving clearance |
| Drainage | Gutter path, outlets and post allocation |
| Motor and hardware | Correct component group and service access |
| Side accessories | Prepared opening and fixing relationship |
| Lighting | Agreed channel, route and service access |
Accessory preparation and quality checks
Checks compare prepared parts with the approved project reference. Typical checkpoints cover profile identity, machining position, visible finish, component allocation, moving interfaces and package completeness. ZIP screens, glass, lighting, heaters and fans are prepared against the openings and electrical interfaces included in the approved configuration.
Packing and export preparation
Long profiles are supported and separated to protect finished surfaces. Motors, controls and hardware are grouped and labeled so receiving teams can connect packages to the drawing set. Final package dimensions, weights and shipping documents follow the actual order and freight plan.
Factory inquiry
For a useful factory review, send the intended model, application, destination, approximate dimensions, quantity and required accessories. Buyers may also identify sample, inspection, labeling or packing requirements that need to be included in the written scope.
Common questions
Can buyers request factory inspection?+
Inspection arrangements and acceptance scope can be discussed before ordering.
Is every pergola fully assembled in the factory?+
Large custom systems may be checked through subassemblies and interfaces rather than complete full-size erection.
How are finishes approved?+
Physical samples or agreed references should be approved before production where color matching is important.
What information follows the shipment?+
The agreed packing list, product drawings and order documentation support receiving and installation.
Project configuration review
Discuss your pergola project with LUCY.
Share your buyer type, project location, intended use and available drawings. LUCY will route the enquiry to the relevant product, engineering or manufacturing review.